Highway Polyurethane Project

By:  Dave Gauger RaiseRite Concrete Lifting Inc.  www.WeRaiseConcrete.com Oconto, Wisconsin – November 3, 2011 RaiseRite was commissioned to raise a 15X45′ section of Off-Ramp located in Oconto.  There was a low spot across the 45′ of roadway.  Traffic would dip … Continue reading

Posted in Case Study | Leave a comment

Polyurethane Cell Tower Project

By: Kirk Roberts Concrete Jack www.ConcreteJack.com Problem:  Due to poor compaction of fill material of a cell tower site, half of the pad was settling, which caused an equipment building and generator pad to settle.  The installation contractor installed two … Continue reading

Posted in Case Study | Leave a comment

Void Fill Under Control Temperature Room in Manitowoc, WI

By: David Gauger RaiseRite Concrete Lifting Inc.  www.WeRaiseConcrete.com DESCRIPTION OF PROJECT Void fill using high density polyurethane. THE PROBLEM: A local technological firm had constructed a control temperature room which was positioned on top of a section of factory floor … Continue reading

Posted in Case Study | Leave a comment

Joint Stabilization in Wrightstown, WI

By: David Gauger RaiseRite Concrete Lifting Inc.  www.WeRaiseConcrete.com DESCRIPTION OF PROJECT Joint Stabilization using high density polyurethane. THE PROBLEM: An area construction company had poured various sections of concrete at a nearby warehouse a few years ago. Due to slab … Continue reading